04.1 — Asset status
Systems that run every day.
Section stub — built in Phase 3.
04.2 — Maintenance agents
A team of agents on every fault.
Section stub — built in Phase 3.
04.3 — Warehouse twin
The whole fleet, live, in 3D.
Section stub — built in Phase 3.